The bullet train
Wednesday, December 9th, 2009One of the main transportation projects for the World Cup 2014 is the building of a bullet train linking São Paulo and Rio de Janeiro, the two largest Brazilian cities. In Portuguese, the train is called Trem de Alta Velocidade (High Speed Train), or TAV; visit the official site of the High Speed Train.
The official TAV site still informs (wth endorsement of the Federal Government) that operations should start before 2014; however, there are strong doubts about that. There are several obstacles to the project, including technical, financial, political and environmental.
In 2007, it was estimated that the bidding process would be finished by 2008, and the trains would be running after seven years; today, it is growing stronger the opinion that the train won’t be ready before 2015.
The Government is looking for private partners to build the railway. On December 7th 2009, the federal Government announced the criteria to be used to select the partners; 70% of the scoring of bidders will be related to the necessity of official fundings (the smaller the necessity, the higher the score), and 30% will be related to the price of ticket to be charged from passengers (the cheaper the ticket, the higher the score).
Below, more information about the project.
The map above shows the route of the railways (click the map to enlarge). Stations in red are already confirmed in the project, stations in green are still under analysis.
One line would connect Campinas (one the largest cities in the State of São Paulo) and the airport of Viracopos (international airport) to the city of São Paulo. The other line would connect São Paulo to Rio de Janeiro, with intermediary stations in the airport of Guarulhos, São José dos Campos and Volta Redonda.

Trains will be 200 meters long. Estimated maximum speed is 300 km/h. Estimated travel times, leaving from Rio, are: to Volta Redonda, 34min; to São José dos Campos, 1h17min; to São Paulo, 1h33min; to Campinas, 2h08min. Currently, flying from São Paulo Rio takes about 1h50min, and driving takes about 5 hours.
There will be two categories of services: Express (between Campinas, São Paulo and Rio) and Regional (intermediary cities). Express trains would fit 458 people, in two classes; regional trains will fit 600 people, in one class.
Estimated prices for a ticket São Paulo – Rio are: R$ 150, economic class, off peak trips; R$ 200, economic class, peak time trips; R$ 250, executive class, off peak; R$ 325, executive class, peak time. Currently, a flight costs between R$ 180 (off peak) and R$ 400 (peak). Current exchange rate is US$ 1 = R$ 1.70.

About 61% of railways will run on surface, 21% across bridges and 18% underground.

Estimated costs total R$ 34.6 billion (about US$ 20 billion). Most of the costs correspond to civil woks; indemnifications will take 11%; systems and equipments will take 10%, and the trains themselves will take 8%.
